Leader of China Manufacturer in Pu Foam and Building Adhesive Industry.
Shanghai Shuode Building Materials Co.,Ltd using unique innovative thinking and strong innovation capabilities, we have developed new products with cross-age significance. It is designed in accordance with the national standard. Shanghai Shuode Building Materials Co.,Ltd intend to gather more industry talents because people's wisdom is driven source for us to advance forward. We plan to allocate a large amount of money for product development and technology upgrades. What's more, we aim to become an influential enterprise in the global market.
CAS No.: | 61788-97-4 | Other Names: | Polyurethane Foam |
MF: | C6H7NO2 | EINECS No.: | 230-391-5 |
Place of Origin: | Shanghai, China | Classification: | Other Adhesives |
Main Raw Material: | POLYURETHANE | Usage: | Construction, Fiber & Garment, Footwear & Leather, Packing, Transportation, Woodworking |
Brand Name: | SHUODE | Model Number: | GE |
Type: | PU FOAM | Certificate: | ISO9001 |
Material: | polyurethane | Application: | Construction, factory, and so on |
Color: | White | Packing: | 12 Pcs |
Quality: | Guarantee | Density(KG/M3): | 17±6 |
Optimal Application Temp.(℃): | -10~+35 | Tensile Strength(Aluminum Plate): | 120 |
Temp. Resistance(Long Term)(℃): | -30~+80 |
High density excellent 750ml Chinese shuode brand pu foam agent
SHUODE PU Foam is a one-component, ready to use multi-purpose polyurethane foam. It has large expansion capacity, which can be applied to insulating and filling of larger seams, joints, cracks such as gaps between walls, windows and doors, unreachable areas.
Use by gun: polyurethane foam
Step 1. Shake the can at least 30 times.
Step 2. Clean and dampen the place where will be filled.
Step 3. Place the can upside down and screw it on the adapter; counter clock wisely open the control valve to have a appropriate flow.
Step 4. Spray the foam from down to up; fill 80% volume of the gap is ok.
Step 5. The tack-free time is about 10 minutes; the foam can be processed after 1 hour.
Step 6. The foam can be trimmed by knife; then its surace can be processed by cement, coating, paint, silicone and so on.
Use by screw: polyurethane foam
Step 1. Shake the can at least 30 times.
Step 2. Clean and dampen the place where will be filled.
Step 3. Place the can upside down and screw the tube on the can; counter clock wisely open the control valve to have a appropriate flow.
Step 4. Spray the foam from down to up; fill 80% volume of the gap is ok.
Step 5. The tack-free time is about 10 minutes; the foam can be processed after 1 hour.
Step 6. The foam can be trimmed by knife; then its surace can be processed by cement, coating, paint, silicone and so on.
1.OEM is available. polyurethane foam
2.Samples can be supplied. polyurethane foam
3.Big order with big discount. polyurethane foam
Related Products
Do you have any questions?
Contact us now.
If you have questions, write to us. Just tell us your requirements, we can do more than you can imagine.
QUICK LINKS
PRODUCTS
CONTACT US
Contact Person: Monica
Tel: +86-15021391690
E-mail: monica.zhu@shuode.cn
WhatsApp: 0086-15021391690
Address: CN , Songjiang , Shanghai, , Room 502, Lane 2396, Rongle East Road